Aim
The aim of this project is to replace the obsolete PSTN system currently used within all grid and primary substations utilizing the latest Digital solutions of fibre optic and VSAT communications systems available at these sites. This aim to digitalize these communications can be further broken down into the following:
Further the transition into digital substations – Integrate Voice communications via VoIP into the existing SCADA communications arrangements.
Compliance with statutory regulation – Maintaining Emergency communications.
Modernization – Incorporating state of the art equipment with improved functionality, improved security, and monitoring functionality.
Buy Answer of This Assessment & Raise Your Grades
The post The aim of this project is to replace the obsolete PSTN system currently used within all grid: HND – Unit 35 Professional Engineering Management Module guide LVL 5 – Digitalisation Assignment, UK appeared first on Students Assignment Help UK.