ASSESSMENT BRIEF
| Assessment Title | Project | Maximum Mark | 50% |
|---|---|---|---|
| Programme/Centre | VESD/ Ennis | ||
| Module/Component Name | Spreadsheet Methods | Date of Issue | 01/10/2025 |
| Module/Component Code | 5N1977 | Submission Date | 07/12/2025 by 11.59pm |
| Assessor Name | Carol Danaher | LOs to be assessed | 1 – 10 |
Are You Searching Answer of this Question? Request Ireland Writers to Write a plagiarism Free Copy for You.
Get A Free Quote
Instructions
Learner is required to:
- Design, implement and modify a spreadsheet project will be based on a topic you have individually researched and decided upon.
- The spreadsheet should contain at least 10 records with a minimum of 6 column headings. The data needs to include both character and numeric types, at least one main heading (merged), column/row headings, at least two different alignments and a range of cell formats e.g. currency, %, decimal.
Presentation of Evidence
- Design Phase documentation included details of the project as specified.
- Implementation Phase documentation including PDF print outs as specified & soft copy of the project.
- Modification Phase documentation
- Reference your work – Ai is not permitted
Assessment/Performance Criteria and Marks
| Maximum Mark | ||
|---|---|---|
| Design | 20 | |
|
||
| Implementation | 25 | |
|
||
| Modifications | Relevant modifications or improvements suggested | 5 |
Submission Details
This assignment must be submitted through teams by 07/12/2025 by 11.59 pm
Get Solution of this Assessment. Hire Experts to solve this assignment for you Before Deadline.
Get A Free Quote
5N1977 Spreadsheet Methods QQI Level 5 Assessment Project – Limerick and Clare Education and Training Board
