BPM309 Cost Management for M&E Works Tutor-Marked Assignment Two 2026 | SUSS

BPM309 Tutor-Marked Assignment TWO (TMA02)

This assignment is worth 20% of the final mark for BPM309 Cost Management for M&E Works.

The cut-off date for this assignment is 2 April 2026, 2355 hrs.

Note to Students:

You are to include the following particulars in your submission: Course Code, Title of the TMA, SUSS PI No., Your Name, and Submission Date.

Question 1

The management of a commercial complex has decided to upgrade the existing CCTV surveillance system to an IP-based digital system to enhance building security, recording quality, and remote monitoring capability.  The current CCTV setup consists of analogue cameras connected to DVR units with limited coverage and storage capacity.

As the Project M&E Quantity Surveyor,

(a) Briefly discuss the scope of works required to implement the upgraded IP-based CCTV system, highlighting the main components, installation works, and integration with the existing building network.

( 15 marks)

(a) Explain the measurement rules and principles that should be applied to quantify the works involved in this CCTV system upgrade, in accordance with the Standard Method of Measurement for M&E Works.

( 15 marks)

Question 2

Interpret Figures Q2.1 and Q2.2 in the Appendix and apply suitable measurement techniques to work out the bills of quantities for the following system:

(a) Air Conditioning System

(40 marks)

(b) Mechanical Ventilation System

(30 marks)

BPM309 TMA 02 Question 2 Figure

Write My Assignment
Hire Professionals for SUSS BPM309 Tutor-Marked Assignment

Native Singapore Writers Team

  • 100% Plagiarism-Free Essay
  • Highest Satisfaction Rate
  • Free Revision
  • On-Time Delivery

The post BPM309 Cost Management for M&E Works Tutor-Marked Assignment Two 2026 | SUSS appeared first on Singapore Assignment Help.