You have been assigned to be the project manager for the facility, equipment, and business system upgrade of a call center. This requires moving all existing call center stations to a newer, larger facility.
The client requirements should be three pages in length to summarize. You must use at least one outside source that is peer-reviewed or academic in nature.
Follow instructions that are included on the attachment.