Question 1
This end-of-course project aims to gauge your ability to
(1) illustrate concepts of risk and risk management;
(2) analyse risk perception and how this affects risk management;
(3) examine the purpose and aims of risk control;
(4) carry out risk assessment using the appropriate tools and techniques for a hazardous work process;
(5) propose and design appropriate risk treatment measures to eliminate or minimise the associated risk; and
(6) apply risk management methods and principles in the selected industry sector.
In support of your company’s business operations, your selected site is undergoing expansion works, which involves addition and alteration works (A&A works) to existing site facilities. As the site operation manager, you are the chairman of the site’s overall risk management team. You are to assist the managing director, at the company level, to oversee operational risks relating to the site’s routine operations and nonroutine risks, showing an understanding of the deployment of risk management approach by doing the following:
(a) Outline the structures of the company’s executive organisation chart, risk management committee, site-level risk management team, and shop floor-level risk assessment teams within the company’s overall risk management framework.
(b) Select a work process that involve the usage of scissor lifts at your workplace
(c) Select and form the risk assessment team for the selected work process.
(d) Review and discuss related past incident history within the company and industry sector. Supplement your findings with literature reviews, historical case studies and/or incident investigation reports.
(e) Conduct a qualitative risk assessment of the selected work process by applying the Job Hazard Analysis tool and Ministry of Manpower (MOM) 5×5 Risk Analysis techniques to identify and analyse the associated hazard-risks. Evaluate the associated hazard-risk with respect to current risk management benchmark. Tabulate the risk assessment, (using MOM RA-Tables). (Note that a comprehensive risk assessment table must be included in the Annex (see below) and will constitute 30 marks of this assignment.)
(f) Identify the various hazard-risk-scenarios from the RA-Tables. Select ONE (1) of the hazard-risk-scenario as a top-event. Examine the top-event using the Fault Tree Analysis (FTA) and appraise how the fault tree was constructed. Explain TWO (2) types of preventive barriers or control measures that can be identified from the FTA.
(g) Review and discuss the current good practices and safety/control technologies relevant to your selected work process. Supplement your findings with literature reviews, seminar or communities of practice sharing, and/or emerging technology.
(h) Analyse the impact of the associated hazard/risk and appropriate risk treatment. In your discussion, identify the advantages and disadvantages and explain why and how the associated risk can be managed. Propose the appropriate risk treatment. In your recommendation, state the advantages, disadvantages and explain why your recommendation is most appropriate.
Stuck with a lot of homework assignments and feeling stressed ?
Take professional academic assistance & Get 100% Plagiarism free papers
The post HFS371 ECA (End-of-Course Assessment) SUSS: July Semester 2024 -Risk Assessment and Management appeared first on Singapore Assignment Help.