International School Security Planning – Jurong East
1. Project Overview
An International School (IS) has been proposed at Jurong East, a 10-minute walk from Jurong East MRT station. The IS consists of 2 four (4) storey buildings. Children of key appointment holders (from overseas countries) are enrolled in this school.
2. Campus Site Details and Provisions
General Site Features:
- 2.4m welded mesh fence line around the campus.
- A Guard House is proposed at the entrance of the Main Vehicular Gate.
- Vehicular barrier (IN/OUT) provided at Main Vehicular Gate entrance.
- A pedestrian Turnstile is proposed next to the Main Vehicular Gate for Staff Access.
- The building is designed with fixed glass façade with no openable windows.
- Staff and Public parking space is provided within the Campus.
- At the front of the building is the main road, entry to the IS.
- At the back of the building is an open field with 3m trees – 2m away from the fence line.
- On the right and left side of the fence line are canals (5m width & 2m depth).
- All visitors are required to register at the Guard House prior to entry into the Campus.
- The operating hours of the IS are:
- 0630 hrs till 2000 hrs (Monday to Friday)
- 0900 hrs till 1300 hrs on Saturdays
Hire a Professional Essay & Assignment Writer for completing your Academic Assessments
Native Singapore Writers Team
- 100% Plagiarism-Free Essay
- Highest Satisfaction Rate
- Free Revision
- On-Time Delivery
Building Space Allocation:
Building 1
Basement
- Aircon, Mechanical & Electrical, IT, Generator and UPS rooms.
- Roller shutter at the Basement Entrance
- Vehicular Drop Arm Barrier at Basement Entrance
1st Storey
- Main Lobby Reception Counter
- Lift (2 nos)
- Principal and Teachers room
- Meeting rooms (4 nos)
- Function room (1 no)
- Lecture Theatre (2 nos)
- Security Control Room (consisting of security equipment)
- Two (2) Staircases and exit staircase doors
2nd Storey
- Lecture rooms
- Music room consisting of musical instruments
- Sports Room consisting of Sports equipment
- Assembly Hall
3rd Storey
- Lecture rooms
4th Storey
- Library
- Computer Lab consisting of computers used by students
- Server room & LAN room
Building 2
1st Storey
- Main Lobby with 2 Lifts
- Two (2) Staircases and exit staircase doors
- Commercial shops and eateries
- Lecture Theatres (2 nos)
- Book Shop
- Cafeteria
2nd Storey to 4th Storey
- Lecture rooms
Roof Garden
- Barbecue Pits
Buy Custom Answer of This Assessment & Raise Your Grades
3. Security Risk Assessment
A risk assessment has already been conducted and a security risk level of Medium to High has been identified. Security mitigation measures should be based on the following threats:
Identified Threats:
Internal Threats:
- Theft
- Vandalism
- Sabotage
- Arson
- Theft of confidential information
External Threats:
- Intrusion
- Theft
- Vandalism
- Sabotage
- Arson
- Theft of confidential information
- Vehicle Ramming
- Kidnapping
- Armed Assailant
4. Project Requirements
The project requires the student to prepare the following:
- Concept Plan proposing the security zoning and security measures (physical & electronic) for the new international school campus, based on the protection in depth approach.
5. Project Report Format
- Introduction
- Risk Assessment – summary based on the information provided
- Concept Plan (based on the protection in depth approach)
- Adjacent/Perimeter Protection
- Building Perimeter Protection
- Space and Area Protection
- Asset Protection
- Recommend security measures (physical & electronic measures)
- Conclusion
Stuck with a lot of homework assignments and feeling stressed ?
Take professional academic assistance & Get 100% Plagiarism free papers
The post Security Concept Plan Assignment Report: International School Campus Protection Strategy at Jurong East appeared first on Singapore Assignment Help.