Task 1 Assessment Instructions Using the scenario information supplied, you will identify strategic change needs, review existing policy, monitor trends in the external environment that impact on organisation’s objectives, identify operational change objectives, prioritise change requirements and consult experts or specialists to assist in identification of change requirements and opportunities. You will then write a report to management outlining the change requirements. Procedure Review the

Course BSB61015 Advanced Diploma of Leadership and Management
Unit Code BSBINN601
Unit Name Lead and manage organisational change
Assessor Name
Student Name
Student ID
Date Due
Please read and sign this assessment coversheet and submit it together with your assessment to your Assessor by the due date.
Student Declaration
I declare that the work submitted is my own, and has not been copied or plagiarised from any person or source.
I have read the Plagiarism Policy and Assessment Appeal and Reassessment Policy in the Student Handbook and I understand all the rules and guidelines for undertaking assessments.
I understand that by typing my full name in the student field this is equivalent to a hand-written signature.
I give permission for my assessment material to be used for continuous improvement purposes.
Student Signature Date Submitted
Assessor Use Only
Assessment Items Result
Task 1 ? Case study
Task 2 ? Report
Task 3 ? Presentation
Final Result for this unit
Student Declaration: I declare that I have been assessed in this unit, and I have been advised of my result. I am also aware of my appeal rights. Assessor Declaration: I declare that I have conducted a fair, valid, reliable and flexible assessment with this student, and I have provided appropriate feedback
Signature Signature
Date
Assessor’s Final Comments
Task 1
Assessment Instructions
Using the scenario information supplied, you will identify strategic change needs, review existing policy, monitor trends in the external environment that impact on organisation’s objectives, identify operational change objectives, prioritise change requirements and consult experts or specialists to assist in identification of change requirements and opportunities. You will then write a report to management outlining the change requirements.
Procedure
Review the scenario information provided in Appendix for Fast Track Couriers and Prepare a 3–4 page report detailing change requirements for Fast Track. Include all of the information you identified and explanations that you prepared in steps 1–8. Submit all documents to your assessor as per the specifications below. Ensure you keep a copy of all work submitted for your records.
To be deemed competent you will need to successfully demonstrate the following:
You must submit:
• A 3-4 page report including all information identified in the procedure below
1. Analyse the organisational objectives provided in the scenario to identify the change requirements for Fast Track Couriers:
a. Identify requirements for change
b. prepare an explanation of how your identified change needs link to the organisation’s strategic plan goal/s.
2. Review the organisation’s current state to understand how the current policies, practices and operations deliver against the organisation’s strategic goals.
Review the organisation’s performance against objectives with regards to its:
a. people
b. processes
c. technology
d. structure.
3. Monitor external trends to identify events or trends which may impact on the achievement of the organisation’s strategic plan goals:
a. identify two external trends
b. develop an explanation of how the trends currently impact or will impact organisational objectives.
4. Identify major operational change requirements:
a. identify changes due to performance gaps
b. identify changes due to business opportunities
c. identify changes due to threats
d. identify changes due to management decisions.
5. Identify specialists to be consulted to assist with identifying change needs:
a. identify specialists you will engage to help identify change requirements and be prepared to explain your reasons for engaging these specialists
b. identify what consulting model you would adopt to engage the specialists and be prepared to explain why you would use this model.
6. Assume your assessor is a specialist/expert of the kind you have identified in step 5. Consult with your assessor to assist with identification of change management requirements and opportunities.
7. Identify the managers that need to be informed. Prepare a plan that identifies who, when and how stakeholder managers will be engaged to review and prioritise change requirements.
8. Assume your assessor is a manager you have identified. Consult with your assessor to review the changes you propose and to help you prioritise changes. Suggest and justify the priority you have assigned to each change you recommend.
Task 2
Assessment Instructions
This is an individual assessment. Using the scenario information supplied, you will undertake a cost-benefit analysis for high-priority change requirements, undertake a risk analysis, identify barriers, and develop mitigation strategies. You will develop a change management project plan, assign resources and develop a reporting process. You will then present their analysis and project plan to management for approval.
Procedure
Review the simulated workplace information for Fast Track Couriers and develop a change management strategy for Fast Track, which you will present to management (your assessor) for approval, by following steps 1–6 below.
1. Identify change goals and specify:
a. who/what is impacted
b. how they are impacted
c. when the impacts will be realised.
2. Identify the change goals you have identified are related to organisation’s strategic goals.
3. Undertake a cost-benefit analysis of the of the change requirements. Include:
a. the change requirements
b. the costs of changes
c. risks
d. the possible benefits of each change
e. assessment of the benefits against the costs and risks
f. categorised changes:
i. feasible (F)
ii. maybe feasible (MF)
iii. not feasible (NF).
4. Undertake a risk analysis of the change requirements:
a. identify the risks and barriers
b. analyse and evaluate the risks and barriers
c. identify mitigation strategy.
5. Develop a change management project plan. In order to justify your plan, include a brief explanation of the change management theory/methodology followed to embed change. Your plan must reflect theory and you must be prepared to explain to management how key elements of your plan, such as stakeholder management, communication, education/training plans, show elements of a particular theory.
6. Include the following components in your plan:
a. Stakeholder management:
i. identify key stakeholders and roles
ii. identify commitment level
iii. identify concerns/issues (and how can these will be addressed)
iv. consultation methods for engaging identified stakeholders.
b. Communication plan:
i. audience
ii. message
iii. when this communication will occur
iv. how the message will be communicated (e.g. email, face to face, newsletter)
v. person responsible.
c. Education/training plan:
i. participants
ii. the skills the training will provide
iii. when the training will occur
iv. how the training will be delivered (e.g. class room, online, on-the-job)
v. person responsible.
7. Your project plan should also include a measuring/reporting strategy. Measurement and reporting strategy should include:
a. how you will measure success
b. how you will report success including:
i. format of reports
ii. when will reports be produced (weekly, fortnightly, monthly)
iii. who will receive a copy of the report.
8. Finally, your project plan should also include a list of resources (tools, supplies, etc.)
9. Gain approval for your change management strategy and ask for authorisation to implement strategy. Your assessor will approve your strategy based on your completion of this assessment task and satisfaction of specifications below.
10. Submit all documents to your assessor as per the specifications below. Ensure you keep a copy of all work submitted for your records.
To be deemed competent you will need to successfully demonstrate the following:
You must submit:
• change management project plan
Task 3
Assessment Instructions
This is an individual assessment. For this task, you are required to demonstrate the skills and knowledge required to implement change management strategy. Using the scenario information supplied, the candidate will conduct an implementation review. The candidate will then consult with a union representative and General Manager to receive input and develop a revised communication plan. Finally, the candidate will deliver a 5 minute information session to employees.
Procedure
1. Review the simulated workplace information for Fast Track Couriers.
2. Following the communications plan provided in Appendix, develop a survey to gather feedback from employees.
3. Meet with a union representative (your assessor) to receive and discuss results of survey. Ask for additional input to help you revise your change management communications strategy.
4. Draft revised communications plan and overall project plan (from Assessment Task 2) in consideration of barriers identified through consultation process (with your assessor acting as a union representative) and those identified in risk analysis provided in Appendix. Highlight strategic elements in your plan that you will deploy to gain trust and acceptance of change. Ensure you consider the needs of all stakeholders to gain support for planned changes.
5. Meet with General Manager (assessor) to discuss ideas for revised communications plan and overall project plan based on feedback.
a. Discuss the needs of all stakeholders.
b. Discuss creative technique, activity or tactic you will use to gain trust and acceptance in the 5 minute information session you will deliver.
c. Ensure you anticipate possible resistance by this stakeholder and promote your plans to gain acceptance.
6. Develop a session plan for a 5 minute information session. Include an outline of what activities you will be doing, how long you will be doing them, and how the activity will achieve the goal of employee acceptance of change process. Ensure you anticipate possible resistance from these stakeholders and plan to overcome resistance.
7. Deliver session to employees (your assessor/other learners). Ensure you take a consultative approach to the session and invite participation, questions, input, etc. and ensure you incorporate a creative technique, activity or tactic in the session.
8. Submit all documents to your assessor as per the specifications below. Ensure you keep a copy of all work submitted for your records.
To be deemed competent you will need to successfully demonstrate the following:
You must submit copy of:
? one survey
? drafts of communications and overall project plans to indicate review of plans (including highlighted strategic element/s)
? planning and support documents for your 5 minute information session (such as a plan for the session, PowerPoint presentation, handouts, and a creative activity for gaining trust and acceptance of change process).

GET HELP WITH YOUR HOMEWORK PAPERS @ 25% OFF

For faster services, inquiry about  new assignments submission or  follow ups on your assignments please text us/call us on +1 (251) 265-5102

Write My Paper Button

WeCreativez WhatsApp Support
We are here to answer your questions. Ask us anything!
👋 Hi, how can I help?
Scroll to Top