Prepare a process flow diagram for the current process. Compute the basic performance metrics (processing rate, cycle time, WIP, throughput time) for each stage of the process AND the process as a whole. Show your work
– Do the same for both of the newly recommended plans (Mike’s and Ike’s). (Note: Different batch sizes may be used at different production stages.) Show your work
– Which plan would you recommend? Would you recommend any modifications to that plan, or some hybrid plan of your own?
-Ensure the chart shows the process diagram for each stage in the process for all three courses of action (current, Mike, and Ike’s process flow)
– Ignore the questions at the end of the document and just provide answers to the above
-The excel sheet is the draft I have started for calculations. However, I am unsure if the calculations are correct.